Hardware Installation
=====================
+Hardware installation breaks down into a few steps:
+
+1. `Planning`_
+2. `Inventory`_
+3. `Rackmount of Equipment`_
+4. `Cabling and Network Topology`_
+5. `Management Switch Bootstrap`_
+6. `Management Server Bootstrap`_
+7. `Server Software Bootstrap`_
+
+Installation of the fabric switch hardware is covered in :ref:`OS Installation
+- Switches <switch-install>`.
+
+Installation of the radio hardware is covered in :ref:`eNB Installation
+<enb-installation>`.
+
+Planning
+--------
+The planning of the network topology and devices, and required cabling
+
+Once planning is complete, equipment is ordered to match the plan.
+
+Network Cable Plan
+""""""""""""""""""
+
+If a 2x2 TOST fabric is used it should be configured as a :doc:`Single-Stage
+Leaf-Spine <trellis:supported-topology>`.
+
+- The links between each leaf and spine switch must be made up of two separate
+ cables.
+
+- Each compute server is dual-homed via a separate cable to two different leaf
+ switches (as in the "paired switches" diagrams).
+
+If only a single P4 switch is used, the :doc:`Simple
+<trellis:supported-topology>` topology is used, with two connections from each
+compute server to the single switch
+
+Additionally a non-fabric switch is required to provide a set of management
+networks. This management switch is configured with multiple VLANs to separate
+the management plane, fabric, and the out-of-band and lights out management
+connections on the equipment.
+
+Device Naming
+"""""""""""""
+
+Site Design and Bookkeeping
+"""""""""""""""""""""""""""
+
+The following items need to be added to `NetBox
+<https://netbox.readthedocs.io/en/stable>`_ to describe each edge site:
+
+1. Add a Site for the edge (if one doesn't already exist), which has the
+ physical location and contact information for the edge.
+
+2. Add Racks to the Site (if they don't already exist)
+
+3. Add a Tenant for the edge (who owns/manages it), assigned to the ``Pronto``
+ or ``Aether`` Tenant Group.
+
+4. Add a VRF (Routing Table) for the edge site.
+
+5. Add a VLAN Group to the edge site, which groups the site's VLANs and
+ prevents duplication.
+
+6. Add VLANs for the edge site. These should be assigned a VLAN Group, the
+ Site, and Tenant.
+
+ There can be multiple of the same VLAN in NetBox (VLANs are layer 2, and
+ local to the site), but not within the VLAN group.
+
+ The minimal list of VLANs:
+
+ * ADMIN 1
+ * UPLINK 10
+ * MGMT 800
+ * FAB 801
+
+ If you have multiple deployments at a site using the same management server,
+ add additional VLANs incremented by 10 for the MGMT/FAB - for example:
+
+ * DEVMGMT 810
+ * DEVFAB 801
+
+7. Add IP Prefixes for the site. This should have the Tenant and VRF assigned.
+
+ All edge IP prefixes fit into a ``/22`` sized block.
+
+ The description of the Prefix contains the DNS suffix for all Devices that
+ have IP addresses within this Prefix. The full DNS names are generated by
+ combining the first ``<devname>`` component of the Device names with this
+ suffix.
+
+ An examples using the ``10.0.0.0/22`` block. There are 5 edge
+ prefixes, with the following purposes:
+
+ * ``10.0.0.0/25``
+ * Has the Server BMC/LOM and Management Switch
+ * Assign the ADMIN 1 VLAN
+ * Set the description to ``admin.<deployment>.<site>.aetherproject.net`` (or
+ ``prontoproject.net``).
+
+ * ``10.0.0.128/25``
+ * Has the Server Management plane, Fabric Switch Management/BMC
+ * Assign MGMT 800 VLAN
+ * Set the description to ``<deployment>.<site>.aetherproject.net`` (or
+ ``prontoproject.net``).
+
+ * ``10.0.1.0/24``
+ * Has Compute Node Fabric Connections, devices connected to the Fabric like the eNB
+ * Assign FAB 801 VLAN
+ * Set the description to ``fabric.<deployment>.<site>.aetherproject.net`` (or
+ ``prontoproject.net``).
+
+ * ``10.0.2.0/24``
+ * Kubernetes Pod IP's
+
+ * ``10.0.3.0/24``
+ * Kubernetes Cluster IP's
+
+8. Add Devices to the site, for each piece of equipment. These are named with a
+ scheme similar to the DNS names used for the pod, given in this format::
+
+ <devname>.<deployment>.<site>
+
+ Examples::
+
+ mgmtserver1.ops1.tucson
+ node1.stage1.menlo
+
+ Note that these names are transformed into DNS names using the Prefixes, and
+ may have additional components - ``admin`` or ``fabric`` may be added after
+ the ``<devname>`` for devices on those networks.
+
+ Set the following fields when creating a device:
+
+ * Site
+ * Tenant
+ * Rack & Rack Position
+ * Serial number
+
+ If a specific Device Type doesn't exist for the device, it must be created,
+ which is detailed in the NetBox documentation, or ask the OPs team for help.
+
+9. Set the MAC address for the physical interfaces on the device.
+
+ You may also need to add physical network interfaces if aren't already
+ created by the Device Type. An example would be if additional add-in
+ network cards were installed.
+
+10. Add any virtual interfaces to the Devices. When creating a virtual
+ interface, it should have it's ``label`` field set to the physical network
+ interface that it is assigned
+
+ These are needed are two cases for the Pronto deployment:
+
+ 1. On the Management Server, there should bet (at least) two VLAN
+ interfaces created attached to the ``eno2`` network port, which
+ are used to provide connectivity to the management plane and fabric.
+ These should be named ``<name of vlan><vlan ID>``, so the MGMT 800 VLAN
+ would become a virtual interface named ``mgmt800``, with the label
+ ``eno2``.
+
+ 2. On the Fabric switches, the ``eth0`` port is shared between the OpenBMC
+ interface and the ONIE/ONL installation. Add a ``bmc`` virtual
+ interface with a label of ``eth0`` on each fabric switch.
+
+11. Create IP addresses for the physical and virtual interfaces. These should
+ have the Tenant and VRF set.
+
+ The Management Server should always have the first IP address in each
+ range, and they should be incremental, in this order. Examples are given as
+ if there was a single instance of each device - adding additional devices
+ would increment the later IP addresses.
+
+ * Management Server
+ * ``eno1`` - site provided public IP address, or blank if DHCP
+ * ``eno2`` - 10.0.0.1/25 (first of ADMIN) - set as primary IP
+ * ``bmc`` - 10.0.0.2/25 (next of ADMIN)
+ * ``mgmt800`` - 10.0.0.129/25 (first of MGMT)
+ * ``fab801`` - 10.0.1.1/24 (first of FAB)
+
+ * Management Switch
+ * ``gbe1`` - 10.0.0.3/25 (next of ADMIN) - set as primary IP
+
+ * Fabric Switch
+ * ``eth0`` - 10.0.0.130/25 (next of MGMT), set as primary IP
+ * ``bmc`` - 10.0.0.131/25
+
+ * Compute Server
+ * ``eth0`` - 10.0.0.132/25 (next of MGMT), set as primary IP
+ * ``bmc`` - 10.0.0.4/25 (next of ADMIN)
+ * ``qsfp0`` - 10.0.1.2/25 (next of FAB)
+ * ``qsfp1`` - 10.0.1.3/25
+
+ * Other Fabric devices (eNB, etc.)
+ * ``eth0`` or other primary interface - 10.0.1.4/25 (next of FAB)
+
+10. Add Cables between physical interfaces on the devices
+
+ TODO: Explain the cabling topology
+
+Hardware
+""""""""
+
+Fabric Switches
+'''''''''''''''
+
+Pronto currently uses fabric switches based on the Intel (was Barefoot) Tofino
+chipset. There are multiple variants of this switching chipset, with different
+speeds and capabilities.
+
+The specific hardware models in use in Pronto:
+
+* `EdgeCore Wedge100BF-32X
+ <https://www.edge-core.com/productsInfo.php?cls=1&cls2=180&cls3=181&id=335>`_
+ - a "Dual Pipe" chipset variant, used for the Spine switches
+
+* `EdgeCore Wedge100BF-32QS
+ <https://www.edge-core.com/productsInfo.php?cls=1&cls2=180&cls3=181&id=770>`_
+ - a "Quad Pipe" chipset variant, used for the Leaf switches
+
+Compute Servers
+
+These servers run Kubernetes and edge applications.
+
+The requirements for these servers:
+
+* AMD64 (aka x86-64) architecture
+* Sufficient resources to run Kubernetes
+* Two 40GbE or 100GbE Ethernet connections to the fabric switches
+* One management 1GbE port
+
+The specific hardware models in use in Pronto:
+
+* `Supermicro 6019U-TRTP2
+ <https://www.supermicro.com/en/products/system/1U/6019/SYS-6019U-TRTP2.cfm>`_
+ 1U server
+
+* `Supermicro 6029U-TR4
+ <https://www.supermicro.com/en/products/system/2U/6029/SYS-6029U-TR4.cfm>`_
+ 2U server
+
+These servers are configured with:
+
+* 2x `Intel Xeon 5220R CPUs
+ <https://ark.intel.com/content/www/us/en/ark/products/199354/intel-xeon-gold-5220r-processor-35-75m-cache-2-20-ghz.html>`_,
+ each with 24 cores, 48 threads
+* 384GB of DDR4 Memory, made up with 12x 16GB ECC DIMMs
+* 2TB of nVME Flash Storage
+* 2x 6TB SATA Disk storage
+* 2x 40GbE ports using an XL710QDA2 NIC
+
+The 1U servers additionally have:
+
+- 2x 1GbE copper network ports
+- 2x 10GbE SFP+ network ports
+
+The 2U servers have:
+
+- 4x 1GbE copper network ports
+
+Management Server
+'''''''''''''''''
+
+One management server is required, which must have at least two 1GbE network
+ports, and runs a variety of network services to support the edge.
+
+The model used in Pronto is a `Supermicro 5019D-FTN4
+<https://www.supermicro.com/en/Aplus/system/Embedded/AS-5019D-FTN4.cfm>`_
+
+Which is configured with:
+
+* AMD Epyc 3251 CPU with 8 cores, 16 threads
+* 32GB of DDR4 memory, in 2x 16GB ECC DIMMs
+* 1TB of nVME Flash storage
+* 4x 1GbE copper network ports
+
+Management Switch
+'''''''''''''''''
+
+This switch connects the configuration interfaces and management networks on
+all the servers and switches together.
+
+In the Pronto deployment this hardware is a `HP/Aruba 2540 Series JL356A
+<https://www.arubanetworks.com/products/switches/access/2540-series/>`_.
+
+Inventory
+---------
+
+Once equipment arrives, any device needs to be recorded in inventory if it:
+
+1. Connects to the network (has a MAC address)
+2. Has a serial number
+3. Isn't a subcomponent (disk, add-in card, linecard, etc.) of a larger device.
+
+The following information should be recorded for every device:
+
+- Manufacturer
+- Model
+- Serial Number
+- MAC address (for the primary and any management/BMC/IPMI interfaces)
+
+This information should be be added to the corresponding Devices ONF NetBox
+instance. The accuracy of this information is very important as it is used in
+bootstrapping the systems.
+
+Once inventory has been completed, let the Infra team know, and the pxeboot
+configuration will be generated to have the OS preseed files corresponding to the
+new servers based on their serial numbers.
+
+Rackmount of Equipment
+----------------------
+
+Most of the Pronto equipment is in a 19" rackmount form factor.
+
+Guidelines for mounting this equipment:
+
+- The EdgeCore Wedge Switches have a front-to-back (aka "port-to-power") fan
+ configuration, so hot air exhaust is out the back of the switch near the
+ power inlets, away from the 32 QSFP network ports on the front of the switch.
+
+- The full-depth 1U and 2U Supermicro servers also have front-to-back airflow
+ but have most of their ports on the rear of the device.
+
+- Airflow through the rack should be in one direction to avoid heat being
+ pulled from one device into another. This means that to connect the QSFP
+ network ports from the servers to the switches, cabling should be routed
+ through the rack from front (switch) to back (server).
+
+- The short-depth management HP Switch and 1U Supermicro servers should be
+ mounted to the rear of the rack. They both don't generate an appreciable
+ amount of heat, so the airflow direction isn't a significant factor in
+ racking them.
+
+Cabling and Network Topology
+----------------------------
+
+TODO: Add diagrams of network here, and cabling plan
+
+Management Switch Bootstrap
+---------------------------
+
+TODO: Add instructions for bootstrapping management switch, from document that
+has the linked config file.
+
+Server Software Bootstrap
+-------------------------
+
+Management Server Bootstrap
+"""""""""""""""""""""""""""
+
+The management server is bootstrapped into a customized version of the standard
+Ubuntu 18.04 OS installer.
+
+The `iPXE boot firmware <https://ipxe.org/>`_. is used to start this process
+and is built using the steps detailed in the `ipxe-build
+<https://gerrit.opencord.org/plugins/gitiles/ipxe-build>`_. repo, which
+generates both USB and PXE chainloadable boot images.
+
+Once a system has been started using these images started, these images will
+download a customized script from an external webserver to continue the boot
+process. This iPXE to webserver connection is secured with mutual TLS
+authentication, enforced by the nginx webserver.
+
+The iPXE scripts are created by the `pxeboot
+<https://gerrit.opencord.org/plugins/gitiles/ansible/role/pxeboot>`_ role,
+which creates both a boot menu, downloads the appropriate binaries for
+bootstrapping an OS installation, and creates per-node installation preseed files.
+
+The preseed files contain configuration steps to install the OS from the
+upstream Ubuntu repos, as well as customization of packages and creating the
+``onfadmin`` user.
+
+TODO: convert instructions for bootstrapping the management server with iPXE here.
+
+Once the OS is installed on the management server, Ansible is used to remotely
+install software on the management server.
+
+To checkout the ONF ansible repo and enter the virtualenv with the tooling::
+
+ mkdir infra
+ cd infra
+ repo init -u ssh://<your gerrit username>@gerrit.opencord.org:29418/infra-manifest
+ repo sync
+ cd ansible
+ make galaxy
+ source venv_onfansible/bin/activate
+
+Next, create an inventory file to access the NetBox API. An example is given
+in ``inventory/example-netbox.yml`` - duplicate this file and modify it. Fill
+in the ``api_endpoint`` address and ``token`` with an API key you get out of
+the NetBox instance. List the IP Prefixes used by the site in the
+``ip_prefixes`` list.
+
+Next, run the ``scripts/netbox_edgeconfig.py`` to generate a host_vars file for
+the management server. Assuming that the management server in the edge is
+named ``mgmtserver1.stage1.menlo``, you'd run::
+
+ python scripts/netbox_edgeconfig.py inventory/my-netbox.yml > inventory/host_vars/mgmtserver1.stage1.menlo.yml
+
+And create an inventory file for the management server in
+``inventory/menlo-staging.ini`` which contains::
+
+ [mgmt]
+ mgmtserver1.stage1.menlo ansible_host=<public ip address> ansible_user="onfadmin" ansible_become_password=<password>
+
+Then, to configure a management server, run::
+
+ ansible-playbook -i inventory/menlo-staging.ini playbooks/prontomgmt-playbook.yml
+
+This installs software with the following functionality:
+
+- VLANs on second Ethernet port to provide connectivity to the rest of the pod.
+- Firewall with NAT for routing traffic
+- DHCP and TFTP for bootstrapping servers and switches
+- DNS for host naming and identification
+- HTTP server for serving files used for bootstrapping other equipment
+
+Compute Server Bootstrap
+""""""""""""""""""""""""
+
+Once the management server has finished installation, it will be set to offer
+the same iPXE bootstrap file to the computer.
+
+Each node will be booted, and when iPXE loads select the ``Ubuntu 18.04
+Installer (fully automatic)`` option.