M13 - Spirent - Verify Re-Write C-VID Upstream
Test Objective
- The purpose of this test is to verify ONU can re-write Priority tagged frames (VLAN ID 0) with single c-VID in upstream to wards OLT
Test Configuration
- Test Setup as shown in Section – 7
- Maple OLT and ONU is activated using VOLTHA
- Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA
Test Procedure
Pass/Fail Criteria