M14 - Spirent - Verify Re-Write C-VID Downstream
Test Objective
- The Purpose of this test is to verify ONU can re-write single C-VID frames as priority tagges frames in downstream towards RG
Test Configuration
- Test Setup as shown in Section – 7
- Maple OLT and ONU is activated using VOLTHA
- Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA
Test Procedure
Pass/Fail Criteria