M25 - Traffic Recovers After ONU Reset (Best Effort)
Test Objective
- Purpose of this test is to verify reset/reboot of ONU is able to recover the traffic on the ONU
Test Configuration
- Test Setup as shown in Section – 7
- Maple OLT and ONU is activated using VOLTHA
- Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA
Test Procedure
- Now manually reset /reboot the ONU
- Verify whether ONU ranges and traffic is restored successfully
Pass / Fail Criteria
- Traffic should stop flowing when ONU is restarted
- After ONU is up, traffic restores automatically on the ONU