M1 - Preprovision and Activate OLT

Test Objective

  • Purpose of this test is to verify new OLT can be added and activated from VOLTHA
  • VOLTHA will connect with OLT physical device and create a logical device with initial ports in its data store.
  • VOLTHA will send Event notifications to ONOS and PON Manager for the newly added OLT

Test Configuration

  • Test Setup is as shown in Section – 7
  • Maple OLT should be reachable to VOLTHA over IP interface on VLAN 4092

Test Procedure

  • Issue commands to VOLTHA to simulate “Add-OLT device” message coming from PON Manager on VOLTHA
  • VOLTHA should initiate connect / activate request to Maple OLT
  • VOLHA will create Logical Device and Ports, and notify ONOS
  • Verify the PON Management traffic between VOLTHA and OLT is tagged with Management VLAN 4092
  • VOLTHA will send OLT-Activated event notification to PON Manager
  • Verify OLT/ONU Status on Device Console
  • ONU should drop all the traffic coming from RG

Pass/Fail Criteria

  • OLT is successfully detected and activated on VOLTHA
  • Logical device and port list is created on VOLTHA and ONOS
  • OLT / ONU status can be seen from Device Console