M11 - Verify Unicast Access
Test Objective
- Purpose of this test is to verify OLT and ONU can pass double tagged traffic
Test Configuration
- Test Setup as shown in Section – 7
- Maple OLT and ONU is activated using VOLTHA
- Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA
Test Procedure
- On Spirent, configure double tagged traffic in downstream direction (1025,1025)
- On Spirent, send untagged traffic in upstream direction
- On the both ports capture traffic and verify the stream
Pass/Fail Criteria
- Upstream:
- Traffic coming out of OLT is double tagged 1025 ,1025
- Downstream:
- OLT will strip outer tag 1025 and send single CVID traffic to ONT