T18 - Spirent - Verify IPv4 Unicast Streams Downstream Case2

Test Objective

  • Purpose of this test is to verify P-BIT parameter is propagated to C-VID when sending downstream traffic to ONU

Test Configuration

  • Test Setup as shown in Section – 7
  • Tibit OLT and ONU is activated using VOLTHA
  • Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA

Test Procedure

  • On Spirent, configure P-BIT for CVID. ex: set P-BIT value to 3
  • On the Receive port end, capture traffic and verify the P-BIT parameter on SVID in Up stream direction

Pass / Fail Criteria

  • P-BIT value s-VID is copied to C-VID in downstream direction