T22 - Simultaneous Data and Video Streams

Test Objective

  • Purpose of this test is to verify OLT and ONU can handle data and multicast traffic

Test Configuration

  • Test Setup as shown in Section – 7
  • Tibit OLT and ONU is activated using VOLTHA
  • Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA
  • Provision Multicast/IGMP service on the ONU from VOLTHA

Test Procedure

  • Send bi-directional data traffic and multicast traffic on the ONU

Expected Result

  • Bi-directional data Traffic and Multicast traffic on the ONU went through successfully