M11 - Verify Unicast Access

Test Objective

  • Purpose of this test is to verify OLT and ONU can pass double tagged traffic

Test Configuration

  • Test Setup as shown in Section – 7
  • Maple OLT and ONU is activated using VOLTHA
  • Provision HSIA/unicast service on the OLT and connected ONU from VOLTHA

Test Procedure

  • On Spirent, configure double tagged traffic in downstream direction (1025,1025)
  • On Spirent, send untagged traffic in upstream direction
  • On the both ports capture traffic and verify the stream

Pass/Fail Criteria

  • Upstream:
    • Traffic coming out of OLT is double tagged 1025 ,1025
  • Downstream:
    • OLT will strip outer tag 1025 and send single CVID traffic to ONT